CP-4

  • Requirement

    1. Test the contingency plan for the system [Assignment: organization-defined frequency] using the following tests to determine the effectiveness of the plan and the readiness to execute the plan: [Assignment: organization-defined tests].
    2. Review the contingency plan test results; and
    3. Initiate corrective actions, if needed.
  • Discussion

    Methods for testing contingency plans to determine the effectiveness of the plans and identify potential weaknesses include checklists, walk-through and tabletop exercises, simulations (parallel or full interrupt), and comprehensive exercises. Organizations conduct testing based on the requirements in contingency plans and include a determination of the effects on organizational operations, assets, and individuals due to contingency operations. Organizations have flexibility and discretion in the breadth, depth, and timelines of corrective actions.

More Info

  • Title

    Contingency Plan Testing
  • Family

    Contingency Planning
  • NIST 800-53B Baseline(s)

    • Low
    • Moderate
    • High
  • Related NIST 800-53 ID

    AT-3;CP-2;CP-3;CP-8;CP-9;IR-3;IR-4;PL-2;PM-14;SR-2